Maria Ygnacio Bike Path Section to Reopen After Storm Damage Repairs
Construction is scheduled to begin on a section of the Maria Ygnacio Bike Path at the U.S. 101 undercrossing, located between Calle Real and Lassen Drive. This repair work is necessary due to storm damage that previously closed the path.…

Santa Barbara Santa Maria San Luis Obispo, CA, September 18, 2026 — Work is set to commence on a segment of the Maria Ygnacio Bike Path, specifically at the U.S. 101 undercrossing. This section of the path is situated between Calle Real and Lassen Drive.
The upcoming construction is a direct response to damage sustained from recent storms, which had previously necessitated the closure of this portion of the popular recreational route. The repairs aim to restore full accessibility and safety for cyclists and pedestrians.
The project’s timeline indicates an anticipated completion by mid-November. However, this schedule is contingent upon favorable weather conditions, a common factor in outdoor construction projects.
Details regarding the contractor undertaking the repair work were not provided. Similarly, the specific nature or extent of the storm damage that led to the initial closure was not detailed in the provided information. The total cost of the repairs was also not made available.
Once completed, the restoration of this section will reconnect a vital link in the local biking network, allowing for uninterrupted use of the Maria Ygnacio Bike Path between the specified access points, pending any unforeseen weather delays.
Story summarized from the original created by Indy Staff on www.independent.com, see more information here.